DATA CENTRES & CRITICAL INFRASTRUCTURE

Secure the power pathway before it becomes the project constraint.

FD helps data-centre owners, developers and investors test the power, infrastructure and commercial assumptions that shape site viability, programme, resilience and long-term operating exposure.

WHY IT MATTERS

Power shapes the site, programme and investment case.

For a data centre, power availability is more than a connection question. Available capacity, connection timing, load ramp-up, redundancy, backup supply, energy cost, efficiency and future expansion all influence whether the site and commercial model are viable. These issues need to be tested before commitments narrow the available options.

FD provides an independent owner-side view, connecting the power pathway with investment, procurement, sustainability and delivery decisions.

DECISIONS WE HELP CLIENTS MAKE

The questions we help owners answer.

Does the site have a credible path to the required initial and ultimate power capacity?
What connection, augmentation and utility lead times should be reflected in the programme and investment case?
How should capacity be staged as customer demand and IT load increase?
What mix of grid supply, backup generation, battery storage and renewable energy best supports the risk profile?
How should resilience, redundancy, maintenance and recovery requirements influence the power strategy?
Are the EPC, IPP, PPA, utility and equipment proposals technically coherent and commercially competitive?
What power-price, fuel, curtailment, connection and technology risks sit behind the base-case assumptions?
What energy-performance and decarbonisation objectives should be embedded before design and procurement progress?
HOW FD HELPS

Owner-side capability across the power pathway.

Site power feasibility and due diligence

Independent review of capacity, load assumptions, connection pathways, costs and expansion risks supporting site selection and investment decisions.

Grid connection and utility strategy

Connection planning, utility engagement, augmentation, interface management and programme risk, including local network requirements.

Supply, resilience and capacity options

Grid supply, behind-the-meter generation, backup systems, battery storage and renewable procurement, tested against capacity, resilience and commercial objectives.

Phased development and load-growth planning

Power roadmaps aligning infrastructure commitment with staged construction, IT-load growth and ultimate capacity, preserving expansion options.

Procurement and commercial review

Procurement strategy, owner’s requirements, proposal evaluation, contract and pricing review, negotiation support and risk assessment.

Sustainability and energy performance

Energy-efficiency and carbon objectives, renewable-energy pathways, metering and performance requirements, and rating coordination.

Owner-side assurance

Independent challenge of assumptions, interfaces, delivery risks and decision papers for owners, investors and boards.

RELEVANT EXPERIENCE, ACCURATELY POSITIONED

Transferable capability from high-availability power systems.

FD’s current experience base is drawn from large-load, high-availability mining and industrial power systems, hybrid generation, grid and off-grid infrastructure, complex procurement, investment evaluation and major-project sustainability delivery. These disciplines are highly relevant to data-centre power and infrastructure decisions.

We do not present that experience as a substitute for specialist data-centre MEP design, facility certification or commissioning. Where a scope requires those disciplines, FD works alongside appropriately qualified specialists so the client receives the right capability for each stage.

WHO WE SUPPORT

Built for owner-side decision-makers.

Owners and developers assessing sites, connection pathways and delivery strategies
Infrastructure investors and lenders testing power assumptions and downside exposure
Project and engineering teams procuring energy and supporting infrastructure
Operations teams planning resilience, maintenance, recovery and future expansion

Need an independent view of the power strategy?

Before site commitment is the least expensive time to test the capacity, connection, resilience and commercial assumptions.

Start a Conversation